HOME ABOUT US KIOSKS CABINETS OTHER PRODUCTS CONTACT US
 
Construction      
 
Protection    
KIOSK
Additions      
ADDITIONS
Order a Kiosk      
 

Ventilation and Air Conditioning
Different levels of natural ventilation are available as integral parts of the kiosk wall or roof.


Click the photo to enlarge

There are many types of vent currently offered: stainless steel louvre vents, PVC brick vents, aluminum powder coated louvre vents, all supplied with an internal screen.

Forced ventilation can be incorporated using fans or air conditioning. External GRP weatherproof cowls can also be fitted where required. Further details and design calculations on natural and forced ventilation can be obtained from our design team.

Integral Floors
A comprehensive range of floor options are currently available. GRP single membrane floors for small cabinets, composite load bearing floors, and steel subframes for larger GRP Kiosks. All steel subframes are supplied as standard with integral lifting points, and are shot blast, zinc primed and painted to BS5493 Table 3 Part 3.

Delivery and Installation
The handling of such large structures requires considerable organisation and experience. The majority of our GRP kiosks are transported by a vehicle with a rear mounted hiab. Assuming we can locate the vehicle in close enough proximity to the prepared concrete base, it is a simple exercise to lift the GRP kiosk into position.

As is often the case with remote sites, accessibility may be a problem and should be assessed by the customer prior to quotation. In circumstances where GRP kiosks cannot be transported in one piece, theycan be assembled on site by our experienced site crew.

Windows
An extensive range of viewing windows are available. Options include standard toughened or laminated safety glass, or even double-glazed aluminum and uPVC windows.

Electrical Installation
Lighting, heating and small power are common additions to most GRP Kiosks. For transportable GRP kiosks, the electrical installation can be carried out at our factory, and indicative insulation and continuity tests taken.

If the GRP kiosk is assembled on site, we can arrange for the wiring to be done for the following erection. All wiring is in accordance with IEE regulations and customer specifications. An extensive catalogue of additional electrical items is available on request.